A SHIP REPAIR PROJECT  

2012-05-09 14:53:19|  分类: 默认分类 |  标签: |举报 |字号 订阅

  下载LOFTER 我的照片书  |

Vessel: MV SILA

Location: Zhanjiang, China

Problem description: There are a couple of cracks on the engine of No.2 Auxiliary generator. Ship owner expect to replace the old engine with a new one, and move engine out through skylight.

Quotation: We estimate that within 3 days, the job can be completed.

Procedure:

0900 lt ,9th April, vessel arrived at Zhanjiang anchorage.

1100 lt, 9th April, Our technical went on board, inspect and gave our solution. We prefer to cut a hole in the No.2 cargo hold, which is more convenient and faster. Instead of owner’s solution, we can put equipment, accessories, etc in cargo hold, where we also can do welding, cutting, pre-repairing, etc.

1700 lt, 9th April, Ship owner confirmed our price, solution and send more RFQs for small repairing jobs.

0900 lt, 10th April, our team went on board again, cut the hole, railings and cleaned other accessories on the way in engine room. At the same time, we inspected other small repairing jobs and started to prepare.

1800 lt, 10th April, Vessel berthed, and the hole in the cargo hold was ready.

0900 lt, 11th April, our team went on board and began moving the old generator away, in order to let engine out and in. Meanwhile, we began repairing radar antenna, lifeboat fiber glass wall, and No.1 cargo crane hydraulic system; rewind a motor of sewage treatment plant, etc.

1800 lt, 11th April, we used the No.2 cargo crane to move new engine into the cargo hold. In the meantime, the old engine was moved out. Ship owner send one more RFQ for underwater cleaning. We sent quotation and confirmed by superintendent that night.

0900 lt, 12th April, underwater cleaning started. The new engine was expected to move into before 1200lt.

1400 lt, 12th April, we moved the new engine in and installed it.

1800 lt, 12th April, most of jobs finished except motor rewinding. In the meantime, owner asked us to arrange annual surveying of lifeboat, GMDSS, etc. Around 2000lt, owner confirmed our price for annual inspection.

0900 lt, 13th April, the surveyors for life boat and radio equipment were on board and started inspecting.

1400 lt, 13th April, all jobs completed and vessel prepared to depart to anchorage.

1800 lt, 13th April, vessel departed.

1400 lt, 14th April, our jobs satisfied NK class surveyor and vessel, then signed, stamped and finished.

Bill Jia(Mr)
IJIN MARINE LIMITED
   We are repairing,supplying,trading...
Tel:       +86-21-51699732
Mobile: +86-15026636864(24hours)
Fax:      +86-21-68888090
Add:     2-603,Lane 138,Rushan Road,Shanghai,200120,China
 Shipserv TradeNet:201579
Register No: 1626036
Certificate/VAT No: 58610100-000-07-11-4

国际船舶物资供应、贸易和工业物资供应、贸易-义景船务有限公司IJIN MARINE LIMITED-sales@ijinmarine.com-008615026636864
国际船舶海事咨询服务-义景船务有限公司IJIN MARINE LIMITED-sales@ijinmarine.com-008615026636864
国际债务追讨咨询服务-义景船务有限公司IJIN MARINE LIMITED-sales@ijinmarine.com-008615026636864
国际缆绳钢丝绳链条贸易-义景船务有限公司IJIN MARINE LIMITED-sales@ijinmarine.com-008615026636864
  评论这张
 
阅读(107)| 评论(0)
推荐 转载

历史上的今天

评论

<#--最新日志,群博日志--> <#--推荐日志--> <#--引用记录--> <#--博主推荐--> <#--随机阅读--> <#--首页推荐--> <#--历史上的今天--> <#--被推荐日志--> <#--上一篇,下一篇--> <#-- 热度 --> <#-- 网易新闻广告 --> <#--右边模块结构--> <#--评论模块结构--> <#--引用模块结构--> <#--博主发起的投票-->
 
 
 
 
 
 
 
 
 
 
 
 
 
 

页脚

网易公司版权所有 ©1997-2016